Posted By -
AS
(1) The review is expected to be 15-16 pages (times new roman, 12 font, double spacing, 1-inch margin)
(2) The structure of the review will be based on BIM, IAQ, IoT, Dynamo, CFD, and verifications.
(3) Timeline: Completion by 9th December
4) Literature reference materials will be provided
5) Non-plagiarised draft
6) WIP to be shared at the end of each day, to make sure that the progress is in the right direction
Copyright © 2021 | Truelancer.com