Compare Proposal

Nothing to compare.

Design HVAC system 382 Rton

  • Posted at : 1 month ago
  • Post Similar Project
50

Budget
12
Proposals
136
Views
Awarded
Status

Posted By -

A

5.0
Projects Posted : 9
Projects Paid : 2
Services Purchased : 0
Total Spent :
35
Feedbacks : 100 %

Project Details show (+) hide (-)

the cooling demand is 382 Rton this is for 56 houses in complex each house has peak cooling load around 24 kW h the total pipe length is 2000 m no problem if more than
delta T =5
CP of water 4.2 kJ/kg. K

This is the chiller link everything about chiller will be here
https://www.carrier.com/commercial/en/sa/products/commercial/chillers/30xw/

i need to calculator everything relation the HVAC system to select
the cooling tower
the diameter of the pipe
the friction losses pipe
1-Major losses
2-Minor losses
Darcy formula for friction losses
pump section
Chilled water loop
Cooling water loop
Air handle unites
energy consumption
in excel file